Building Code Requirements

All construction in the Town of Summerville must comply with applicable building code requirements as shown in the following editions adopted by the Town:

  • 2015 International Building Code with SC modifications
  • 2015 International Mechanical Code
  • 2015 Int. Code with SC modifications
  • 2015 Int. Fire Code with SC modifications
  • 2015 Int. Residential Code with SC modifications
  • 2014 National Electric Code
  • 2015 International Plumbing Code
  • 2009 International Energy Conservation Code
  • 2015 International Existing Building Code
  • 2015 International Property Maintenance Code
  • 2017 ICC/ANSI A117.1 Accessible and Usable Buildings and Facilities

Plan Reviews

In most cases, the maximum time required for residential and commercial plan review is three weeks. Inspections can usually be performed by the end of the following business day. The amount of time can vary due to workload, weather, etc. However, it is our policy to be as expedient and helpful as possible.

Building Permit Packets

  • Contact list for building permit process
  • Building permit application with fee schedule
  • Impact fee study
  • Tree permit application
  • Business license application with class rate sheet
  • Plot plan requirement checklist
  • List of required inspections
  • Subcontractor List